Brand Name: | KOMAI |
Model Number: | O-3325 |
MOQ: | Negotiable |
Price: | Negotiable |
Payment Terms: | T/T, Western Union, L/C, Cash |
Supply Ability: | 1000pcs/Week |
Daewoo DH215-9 Lube Oil Filter 4085913 6721-51-4220 ELF7670 3310169 LF3325 400508-00053
1.Air filter filtering precision: 10-30 micron
2.Filter Medium: glass fiber, HV filter paper, Ahlstrom Filtration Paper, stainless steel sinter fiber and stainless wire mesh.
3. Packing: KOMAI packing/ Customize Packing/ Blank Packing/ Make customize sticker for customers
KOMAI NO. | O-3325 |
Type | Lube Oil Filter |
Outer Size(mm) | 287.27*120.27 |
Thread | 1 1/2-12 UNS-2B |
Carton' Quantity(pcs) | 12 PCS |
Weight/box(kg) | 23.5 kg/box |
Carton Size(cm) | 55*42*34 |
Product Details:
GUANGZHOU KOMAI FILTER CO.,LTD
★ Our company mainly produce oil filters, fuel filters, fuel water separator, hydraulic filters and air filters for truck filters and Engineering machine filters, including Tracor, Forklift, Wheel Loader, Excavator, Crane, Generator, Air compressor and AgriculturalMachine.
1. Extensive Coverage:
Provide filter requirements for the world's major well-known brand machinery to achieve global coverage.
2. Precise Positioning:
Through early communiion and assistance, clarify customer needs, and accurately position the product system and market price.
3. Technology Leadership:
Using a number of independent patented technologies, the production has extraordinary stability and reliability.
4. Special Development:
According to the model you provide, we can customize high-quality products for you.
5. Energy Efficiency:
Carefully implement the industry standard, choose the best filter material, save maintenance cost for users, improve the rate of return on
investment.
FAQ
Q1: What kind of products can you make?
A: We can make Air Filters, Oil Filters, Fuel Filters Hydraulic Oil Filter for Construction machinery, heavy trucks, industrial
machine and dust collector.
Q2: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3: What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4: How about your delivery time?
A: Generally, it will take 2 to 15 days after receiving your advance payment. The specific delivery time depends on the items and
the quantity of your order.
Q5:Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.